The front of the 55-foot tall Vishnuprayag Hydroelectric Project provides an idea of the size and scale of the dam and its location in a tight valley near the headwaters of the Alaknanda River. Both sides of the dam, front and rear, were buried in mud and boulders. Excavation is taking months. Photo: Dhruv Malhotra

The front of the 55-foot tall Vishnuprayag Hydroelectric Project provides an idea of the size and scale of the dam and its location in a tight valley near the headwaters of the Alaknanda River. Both sides of the dam, front and rear, were buried in mud and boulders. Excavation is taking months. Photo: Dhruv Malhotra

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply